SELECTED PROJECTS

1. Shoring Works, Piling Works and Jetty Construction (2015)

• Owner: Gulf Floor L.L.C.

• Consultant: M/S. SYR Consultants.

• Location: ICAD II City (A).

• Contractor: Al Dhafra Int.l Group Projects.

The Project involved the construction of temporary casings pile and marine construction. 

◦A total of 7,000 piles

◦Jetty length = 348 LM

2. Shoring Works and Piling Works (2008 - 2010)

• Project: Building Materials City Phase I

• Owner: Manazel Real Estate

• Consultant: Ehav Engineering Consultants

• Location: Moh’d Bin Zayed City M-2

The Project involved the construction of Sheet Piling Shoring Works and Piles.

  • 3500 piles
  • 1865 LM of sheet piling

3. CFA Piles Construction, ICAD City (2007 - 2010)

  • Project: Residential City
  • Owner: Al Eskan Jamae
  • Consultant: Syed Khalaf Consultants
  • Contractor: ASCORP
  • Location: ICAD Residential City

This project involved the construction of a total of piles = 12,000 piles.

4. Sheet Piling Shoring and Piling Works (2015)

• Project: Design & Build Service Tunnel

• Client: Tourism Development & Investment Company   

• Consultant: HSS Consultants

• Location: Saadiyat Island

• Contractor: Nurol L.L.C. 

The Project involved the construction of shoring of 3,200.0 LM of sheet piling and the construction of 618 piles.

5. Shoring Works with supporting System, Deep Wells Construction  and Piling Works for Tower Crane (2015)

• Project: Shoring Works for Two Residential Buildings. 

• Owner: Sheikh Sultan Bin Khalifa Bin Nahyan. 

• Consultant: Design & Construction Eng. 

• Location: Sector E-48, Rawdhat. 

• Contractor: Nurol L.L.C.

The project required the construction of Secant Pile 900 mm Shoring Works with Strut Supports, the construction of deep wells and piling works for a tower crane.  

6. Secant Pile Shoring Works and Temporary Casing Piling Works (2016)

• Project: Secant Pile Shoring for Al Taiba General Hospital

• Owner: Dr. Ali Al Hosani

• Consultant: DAMAN Engineering

• Contractor: Ithmar General Contracting

• Location: Khalifa City A, Sector SE-26,

Abu Dhabi, U.A.E.

The Project design was 418.0 LM of Secant pile shoring and the construction of 531 Temporary casing piles.

7. Secant Pile Shoring Works and Temporary Casing Piles Construction (2017)

• Project: Secant Pile Shoring Works and Temporary Casing Piles for Commercial Building

• Consultant: Zawaya Engineering Consultant

• Contractor: Mazaya Emirates Construction

• Location: Madinat Zayed, West Region – MZW 16,

Abu Dhabi, U.A.E.

The project included the construction of a Secant Pile Wall Shoring Works and the construction of 158 Temporary Casing piles.

8. Construction of Piles and Testing for Bridge Construction, Ministry of Public Works (2016)

• Project: Proposed Improvement of Intersection of

Umm Al Quwain Falaj Al Mualla – Bridge #1 and #2

• Owner: United Arab Emirates – Ministry of Public Works

• Consultant: Idrosse Infrastructure

• Contractor: Combined Group Contracting Emirates L.L.C.

• Location: Umm Al Quwain, U.A.E.


This project included the construction of 339 piles with Length of each Pile equal to 19.50 meters.

9. Piling Works, Command of Military Works (2017)

• Project: Piling Works for Proposed Bridge No.1.

• Owner: Command of Military Works. 

• Consultant: Core Alliance Engineering.

• Contractor: Combined Group Contracting Emirates L.L.C. 

• Location: Al Hamra, Abu Dhabi, U.A.E.

The project involved the construction of 148 piles with 13.0 meters length.

10.  Sheet-pile Shoring Works (2018)

• Project: Reem Island Sectors 2 and 3 - RT-2

• Owner: Tamouh

• Consultant: CH2M

• Contractor: National Projects Construction, NPC

• Location: Al Reem Island, Abu Dhabi, U.A.E.

The project involved 265 LM of sheet-pile construction with length = 12.0 meters.

11. Piling Works, Government of Fujairah (2018)

• Project: Sheikh Khalifa Central Hospital

• Owner: Government of Fujairah / Initiative of His Highness the Head of State

• Consultant: Consolidated Consultants Engineering & Environment (CCEE)

• Contractor: Fibrex Construction Group

• Location: Al Faseel, Plot J/67A, Fujairah, U.A.E.

The project involves the construction 1836 piles with length = 13.0 meters.

12. Pile Construction with Pile Diameter = 1850 mm, Etisalat (2017)

• Project: Piling Works for 40.0 meter height Telecommunication

Monopole Tower With Bentonite System (Permanent Casing)

• Owner & Consultant: Etisalat. 

• Contractor: ITS. 

• Location: Um Al Nar, Abu Dhabi, U.A.E. 

Project Details: 

• Pile Diameter = 1850 mm.

• Length of Piles = 8.0 meters.

13. Piling Works, Abu Dhabi Airport (2017)

• Project: Contract for the Supply and Installation of Apron

Mast Lights at Abu Dhabi International Airport

• Owner: Abu Dhabi Airports

• Consultant: Firas Engineering Consultants

• Location: Abu Dhabi Airport, Abu Dhabi, U.A.E.

Project Details: 

•Pile Diameter = 900 mm.

•Length of Piles = 6.0 meters.

14. Shoring and Piling Works, Dubai, Fibrex (2018)

• Project: Proposed ( B+G+9) Building

• Owner: Mr. Bolton Real Estate Development L.L.C.

• Consultant: Omar Moujaes Architects

• Contractor: Fibrex Construction Group 

• Location: Al Merikadh - Plot # 3479492 - Dubai, U.A.E.

Project Details:

• Shoring: UC 305 x 305 x 97, Length = 391 meters

• Pile Diameter = 750 mm & 900 mm.

• Length of Piles = 14.0 meters.

• Total No.of Piles = 586

15.Shoring Trench with King-Post Girders & Sheetpiling Panels, Tamas (2019)

• Project: Construction of Internal Road 

• Owner: Musanada 

• Consultant: ATKINS

• Contractor: Tamas Projects 

• Location: Baniyas, U.A.E.

Project Details:

• Trench Construction = 1376 LM

• King Post Section with Sheetpiling Panels. 

16. Shoring and Piling Works, Arab European Hospital,  Al Dhafrah Int'l Projects (2019) - Ongoing

• Project: Proposed Speciality Hospital & Staff Accomodation

• Owner: H.E. Hamad Suhail Al Khyeli 

• Consultant: STH Society Technology House

• Contractor: Al Dhafrah International Projects

• Location: Um Al Nar, Sas Al Nakhil - Plot No.1,  U.A.E.

Project Details:

• Shoring = Secant Pile 900 mm , Length = 572 LM

• Piling Works

Pile Diameter = 600 mm.

Total No. of Piles = 2400

17. Construction of Artificial Island - Offshore Platform (2019)

Project: Construction of Shoring System for Offshore Platform - Artificial Island

Private Island

Project Details: 

Shoring Area = 16.40 meters x 16.40 meters, with strutting system


prev next

18. Construction of Infrastructure - Shoring Works

• Project: Rahayel Project, Construction of Infrastructure Area 1, Zone 2 ( Manhole and Pipelines)

• Owner: Higher Corporation for Specialized Economic Zones 

• Consultant: KEO International Consultants

• Contractor: Bin Hafeez Gen. Cont. L.L.C.

• Location: ICAD III, Abu Dhabi, U.A.E.

Project Details: 

Shoring: Universal Column with Sheet-pile panels 

Trench Shoring Length = 2,500 meters, Width = 4 meters


19. Shoring: Kingpost Girders with Precast Panel, Piling: Temporary Casing Piles (2019)

• Project: Shams Reflection Towers A & B

• Owner: Al Dar Properties

• Consultant: ATKINS

• Contractor: Fibrex L.L.C. 

• Location: Al Reem Island, Abu Dhabi, U.A.E.

Project Details:

Shoring: Universal Column with Precast Concrete Panels = 127 LM

Piling: 374 Temporary Casing Piles

Testing: Integrity, Dynamic and Static Load




prev next

20. CFA Piles, 10,913 piles, Al Mirfa Beach Housing - 410 Villas (2019)

Project: Al Mirfa Beach Housing - 410 Villas

• Owner: Musanada

• Consultant: Pioneer Engineering Consultancy L.L.C. & Dorsch Gruppe - Dorsch International Consultants

• Contractor: Combined Group General Contracting

• Location: Al Mirfa, Abu Dhabi, U.A.E.

Project Details:

Piling: 500 mm and 600 mm diameter, CFA Piles = 10,913 piles

Testing: Integrity, Dynamic and Static Load

21. No. of Piles = 4 piles, Temporary Casing Piles, Diameter = 1000 mm (2019) 

• Project: GSM Tower No.112 

• Owner: ADNOC & Etisalat 

• Consultant: Al Sameeh Engineering Consultant

• Contractor: Inteltec Emirates

• Location: Das Island, Abu Dhabi, U.A.E.

Project Details:

Piling: 1000 mm diameter, Temporary Casing Piles = 4 piles

22. Shoring: Sheetpile with Struts & Anchor Bolts, CFA Piling (2019)

• Owner: Command of Military Works (CMW)

• Consultant: Command of Military Works (CMW)

• Contractor: Al Dhafra International Projects Group


23. EH Private Island - Shoring Sheetpile, Piling Works, Anchor Pipes filled with Concrete, Jetty & Pontoon Construction and Access Ramp & Decking System (2019) 

• Project: EH Private Island

• Owner: Eagle Hills

• Consultant: Al Gurg Consultants

• Contractor: Al Ryum Contracting

• Location: Al Reem Island, Abu Dhabi, U.A.E.

Project Details:

Shoring: Sheetpiling 12,250 LM.

Piling: CFA piles, diameter 500 mm and 750 mm. 

Anchor Pipes filled with Concrete for Pedestrian Pontoon.

Access Ramp and Suspended Deck System. 

prev next

24. Trench Sheetpile Shoring Construction (2019)

• Project: Najmat Al Reem Island - Phase 2

• Owner: Al Reem Developers

• Consultant: Rafik El Khoury and Partners Consulting Engineering

• Contractor: Trojan General Contracting 

• Location: Najmat Abu dhabi, Al Reem Island, Abu Dhabi, U.A.E.

Project Details:

Shoring: Sheetpile 1,250 LM

prev next

25.  Piling CFA 750 mm Diameter (2019)

• Project: Proposed  Chic Residence Hotel Apartment

• Consultant: Pioneer Engineering Consultants

• Contractor: Bin Maktoum General Contracting 

• Location: Masdar City, Abu Dhabi, U.A.E.

Project Details:

CFA Piling Construction 750mm Diameter

Testing: Integrity, Dynamic and Static Load

prev next

26. Permanent Casing Piles, Diameter = 1850 mm (2019)

• Project: New LED Lighting System - Proposed  Hamriyah Sports & Cultural Club

• Consultant: Directorate of Public Works

• Contractor: Musco Gulf Lighting and Contracting L.L.C.

• Location: Al Hamriyah West Area, Sharjah, U.A.E.

Project Details:

Permanent Casing Piles with Diameter = 1850 meters with Template and Anchor Plates

prev next

27. Soil Improvement Works, Rigid Inclusion with diameter = 450 mm) & Piling Works CFA and Temporary Casing (2007)

• Project: Building Materials City Phase II and III,

  Soil Improvement using RI and Piling Works

• Owner: Manazel Real Estate

 Consultant: EHAF Consulting Engineers 

• Location: Mohammed Bin Zayed M-2, U.A.E.

Project Details:

RI with Diameter = 450 mm

Area Covered = 56000 m2

No. of Piles = 4500 